![]() |
Drive shafts, clutch and gear box from Roger Williams (SDC) |
![]() |
|
![]() |
![]() ![]() |
Reconditioning Water pump Roger Williams 15 Sept 2004 |
Above, New turbine from CTA service
|
Sept 04 Dismantling front suspension for reconditioning
5 November Rear brakes and handbrakes rebuilt, wiper mechanism, front axle powder coated.
22 January 05 Using the farmer's 50 tonnes press to push the lower arm splines back into position for the reconditioned silent blocks.
31 January Setting up the distance of the lower arms and mounting new silent blocks using Gauge MR 3447 made by Roger Williams.
09 March Picking the cradle assembly up again
27 March Pushing the cradle back on the body and pre-tensioning silent blocks
03 April 05 Engine back in place and silent blocks neutralised